mchaussee3374 mchaussee3374
  • 21-10-2022
  • Business
contestada

a polisher has a production cycle that consists of 36 minutes of setup time, followed by 53 minutes of production. while producing, the polisher produces 212 parts per minute. what is the capacity of the polisher in parts per minute?

Respuesta :

Otras preguntas

What is 225.286 rounded to the nearest ten, one, and hundredth
a number is 42,300 when multiplied by 10. find the product of this number and 500.
6842 round to the nearest to thousand
fourth step occasionally required to repair damaged relationships is         A. changing the behavior that caused the problem.   B. communicating honestly and o
-6Y-3=3-6Y what the answer
Which number has the same value as 50 tens? 5010, 500, 50 or 5
what was a central issue related to the stability of mexico
Is 12.54greater than 1.254
What is three fourths minus five tenths
Points A (-10,-6) and B (6,2) are the endpoints of AB. What are the coordinates of point C on AB such that AC is 3/4 the length of AB? a. (0,-1) b. (2,0) c. (-2