ckfuentes3828 ckfuentes3828
  • 26-03-2024
  • Business
contestada

What is the reason for the variation between the production plan and the actual production?
1) Human error
2) Machine malfunction
3) Market demand
4) Raw material shortage

Respuesta :

Otras preguntas

solve a/3+4=6. it's a weird 2 step equation
What is the variable equation for 5 less than twice a number is 7? 5-2n = 7 5n - 2 = 7 2-5n = 7 2n - 5 = 7 which answer?
“If you make a habit of buying things you do not need, you will soon be selling things you do.” --Filipino Proverb meaning ?
someone help me with and tell me how to do it!
Organizing the Elements • Understanding Main Ideas 1. atomic The diagram at the right is a square from the periodic -2. chemio table. Label the four facts sho
How do biological systems respond when acids or bases are added? O Cells produce different molecules that can function at the new pH levels.O Most biological mo
if 6 boys can do piece of work in 8 days, how many days will 16 boys do the same work at the same rate?​
A backyard is 40.5 feet long and 25 feet wide. In order to install a pool, the yard needs to be reduced by a scale of One-third. What is the area of the reduced
30 1/4% in simplest form
What exponent equals to 256