ariannagonzalez11 ariannagonzalez11
  • 22-06-2018
  • Mathematics
contestada

a construction company can remove 2/3 tons of dirt from construction site each hour how long will it take them to remove 30 tons of dirt from the site?

Respuesta :

Goldenpineapple123
Goldenpineapple123 Goldenpineapple123
  • 22-06-2018
You would want to divide 30 by 2/3 so you would do 30/1 times 3/2. This method is known as keep change flip or kcf (Kentucky Chicken Fried is what some people say) your final answer should come out to 90/2 which simplified is 45. Hope this helped
Answer Link

Otras preguntas

What was the major cash crop grown in the Caribbean by colonial powers?
¿Cómo se dice date en español? semana mes año fecha
What powers did the new government have under the Constitution that the Confederation lacked?
A thermometer is placed in water in order to measure the water’s temperature. What would cause the liquid in the thermometer to rise? A. The molecules in the wa
10 more than 8 times a number a is b
In ΔABC, ∠ ABC is a right angle included between AB = 3 units and BC = 2 units. ΔABC is dilated by a scale factor of 0.5 with point B as the center of dilation,
What does the Code of Chivalry tell us about medieval values in general?
Which of the following phrases are examples of jargon? Check all that apply. A. staging area B. supply air lock C. hot zone D. outside world.E. garbage bags
what is Romanticism?
what does -1/2 * 1/2 = to