matthewbranch4863 matthewbranch4863
  • 25-08-2020
  • Business
contestada

The bottom-up approach for estimating times and costs that uses costs from past projects that were similar to the current project is known as

Respuesta :

topeadeniran2 topeadeniran2
  • 26-08-2020

Answer: template method

Explanation:

The bottom-up approach for estimating times and costs that uses costs from past projects that were similar to the current project is known as template method.

It should be noted that estimating time and cost are vital because it helps schedule work, develop needs of cash flow and show progress of a project.

Answer Link

Otras preguntas

what the slope (0,7) and (2,4)​
The table below shows the ages of houses to the nearest year in a neighborhood. Using the age of the houses as the random variable, X, which graph shows the pro
Which base is found only in DNA? adenine guanine cytosine thymine
sue gets paid 215 dollars every 2 month how much will she have in a year all together
6+ (-1/4) = it is making me do 20 characters in brainly​
Solving for x solve x+7=-3x
Why is it important to cool down after your exercise session? A. To allow the heart rate to slow back down to normal B. All of the above C. To allow the b
A fish store received a shipment of 246 goldfish. The owner of the store arranged the fish into small tanks of 8 fish per tank. How many fish were left over?
Which of the following illustrates the truth value of the following statements? A line, and a point outside the line are in exactly one plane or two planes in
If APQR = ATSR, what are the congruent corresponding parts?