dsethardin703 dsethardin703
  • 21-12-2020
  • Business
contestada

A budget that is based on the actual activity of a period is known as a:__________.
a. continuous budget.
b. flexible budget.
c. static budget.
d. master budget.

Respuesta :

ayfat23
ayfat23 ayfat23
  • 22-12-2020

Answer:

A

Explanation:

Answer Link

Otras preguntas

PLZ HELP DUE IN 10 MIN!! A diagram of a lot of land is shown. The scale on the diagram is 1 cm represents 2.5 yards. What is the perimeter of the actual lot of
What is illegal to do in California?
I need help please and thank you
what is a similarity between communism and socialism ?
Ever since she was little, people told Amelia she would never become a doctor. Starting in ninth grade, she decided to prove them wrong. She made straight As a
I need so much help please :) <3
32. Both of the changes to the US. resulted in Help me please
Simplify the expression. (5-5i)-(-6-3i)
The daily change in barometic pressure for 4 days are: .05, .09, .04, and .18 inches. What is the mean change?​
Simplify 6 20 × [ 8 15 ] ÷ [−3 10 ]