ethelmcdonald4118 ethelmcdonald4118
  • 21-12-2020
  • Business
contestada

A system has three components in parallel with reliabilities 0.9, 0.7, and 0.5. System reliability is:______

a. 0.315
b. 0.700
c. 0.900
d. 0.985
e. 2.100

Respuesta :

Ritmeks
Ritmeks Ritmeks
  • 23-12-2020

Answer:

0.985

Explanation:

A system contains three components that are arranged in parallel, they include 0.9, 0.7 and 0.5

Therefore the system reliability can be calculated as follows

= 1 - (1 -0.9)×(1-0.7)×(1-0.5)

= 1 - 0.1×0.3×0.5

= 1 - 0.1×0.15

= 1 -0.015

= 0.985

Hencd the system reliability is 0.985

Answer Link

Otras preguntas

read the scenario. then determine whether the person should use library or internet research, and why.
Which of the following solutions have a concentration of 0.11 g/mL?
At Shannon's Pancake House there are 228 dirty coffee mugs and 247 clean coffee mugs. What percentage of the coffee mugs at the pancake house are dirty? Write y
Money market refers to ?
please help me i can't
the aquarium of americas has two new shark tanks. each shark tank holds a total of 1,440 gallons of water. the ratio of sharks to gallons of water in tank 1 is
Find the volume of the cylinder, round your answer to the nearest hundredth.
What is a common effect of bullying on the victim? question 1 options: the victim may physically harm him or herself. the victim may develop heart disease. the
During a high school hockey ​game, every spectator placed his or her ticket stub into one of several containers. After the​ game, the coach chose ten people to
6834/17 please show your work