Which stage in project management involves team members working on the assigned tasks as described in the project plan?

A.
initiation
B.
monitoring
C.
execution
D.
closure
E.
planning

Respuesta :

bratislava bratislava
  • 29-05-2021

Answer:

C.  execution

Explanation:

  • The execution stage is 3rd stage in project management lifecycle is usually is longest phase as during which the teams develops the product or services and presents the final end product to the clients. Here the team members work on the same set of guidelines that are assigned or designed in a project.
Answer Link

Otras preguntas

What is the role of the skull, the meninges, and the blood-brain barrier?
Which of the following rational functions is graphed below
What type of efficiencies can digital freight brokerage services generate? How can such efficiencies be reflected on the truck drivers' income?
Joseph noticed he was having a difficult time remembering and becoming more easily confused. After discussing this with his doctor, Joseph was diagnosed with on
C is the center of the circle. Chords AB and DE are congruent, and the measure of arcs AB and DE are shown. Solve for x.
Determine the number of cubes in each figure. The figures are symmetrical. If a cube is left out in the base, it is left out all the way through the design
If the king needed more knights what would he do?
rita bought 6 indenical sweaters tax was $12.48 and her total cost was $204.48 how much
Please help and explain!! Find the surface area and the volume of the solid to the nearest tenth.
The triangular prism below has a base area of 26 units^2 ? and a volume of 130 units^3. Find its height.