A volume variance is the difference between overhead at maximum production volume and that at the budgeted production volume.
a. True
b. False

Respuesta :

MissPhiladelphia
MissPhiladelphia MissPhiladelphia
  • 07-04-2017
The statement is not correct. Therefore, the answer is letter B. False. The actual definition of a volume variance is that it is the difference of the quantity consumed and the amount budgeted to be sold, the difference will furthermore be multiplied to the standard unit per price. 
Answer Link

Otras preguntas

Which part of speech is the underlined word? Stale bread sometimes gets moldy. A. verb B. adjective C. preposition D. adverb
All of the following are guiding principles of a historian EXCEPT: A. accuracy B. honesty C. subjectivity D. empathy
whats a prime number
What was a major result of Henry Fords innovative manufacturing techniques?
How did the king prevent the colonial population from growing?
what is the answer.
Activities that occur during the reconstitution phase of the continuity implementation cycle are
Why did Truman react so strongly when North Korea attacked South Korea? A. He wanted to protect US troops stationed in South Korea B. He wanted to prevent the
the area around New York was claimed by who
What is the power of a court to declare a law unconstitutional called ?