lexiii148 lexiii148
  • 23-08-2017
  • Business
contestada

How many back-up contracts can be created using the trec-promulgated addendum?

Respuesta :

andriansp andriansp
  • 30-08-2017
The answer for this question is: ONE
In this case, TREC stands for Texas Real estate commission. The Back-up contract is created to determine the buyer next-in line to purchase the property. 
By making this, the seller will be obligated to approach next-in line buyer if the first buyer fail to fulfill the approved contract
Answer Link

Otras preguntas

What was one result of the war of 1812
7/8 - 1/3 = Reduce to lowest terms. please help thank you
Most of the nutrients in the rainforest ecosystem are in the _____. organisms groundwater topsoil air its organisms nvm
Which Roman numeral is equivalent to the number below? 60 A. XL B. LXX C. LX D. CL
In centimeters, what is the unknown length in this right triangle?
Find the non permissible replacement of 1/-8x
what are the pros and cons of acknowledging a patient's religious or political beliefs within a tree Healthcare setting support the answer your answer with exam
The function of mRNA is __________, while the function of rRNA is __________. A. helping wind the DNA up, producing ATP B. producing ATP, helping wind the
Plz help According to the chart above, which of the following statements best describes the relationship between income and literacy in sub-Saharan Africa? A.
Dams may prevent salmon from breeding by _____. A. forming lakes B. increasing water flow downstream C. separating the males from the females D. blocking th