  • Mathematics
contestada

If it took eight men ten hours to build a wall, how many hours would it take four men to build it?

Respuesta :

generalbiscuit
generalbiscuit generalbiscuit
  • 23-10-2017
Two hours bc if it takes 8 to do it in one hour and u split the number of men u have in half you double the work hours 8men=1hour of work 4men=2hours of work
Hope this helps have a nice day
Answer Link
Topmadworld
Topmadworld Topmadworld
  • 23-10-2017
8 men= 10hours
Now,
4men= ? hours

Since there are lesser number of men, the amount of time needed will be greater.. Thus, you need to multiply the amount of hours by 2! If you are thinking why, look at the following steps
8/2=4 (men)
10 x 2= 20(time)

Thus the answer is 20

Hope this helped :))
Answer Link

Otras preguntas

Compare and contrast centipedes and millipedes
If snow is falling at a rate of 1/4 inch every 30 minutes, how much snow will fall in 4 1/2 hours.
What is 1/2 of a liter in mL?
School is cancelled if there is at least 8 inches of snow at 5am. If there are three inches of snow at 8 pm the night before and snow is predicted to fall at
what is the perpendicular adjacent sides in the triangle
How can you tell when a solution is formed?
Is moss a decomposer?
Which statement is inconsistent with the concept of isotopes of the same element? a. Isotopes have the same number of protons b. Isotopes have the same atomic n
What is the compound of the way someone will do your hair
Why is technology a challenge to skills management ?How can businesses selling the same goods/services eliminate competition ?