junebug7801 junebug7801
  • 21-11-2017
  • Business
contestada

Relative to the project's life cycle, when is the cost per risk discovered typically highest

Respuesta :

andriansp andriansp
  • 01-12-2017
Relative to the project's life cycle, the cost per risk discovered is typically highest during the end of closing of a project.
For any project, a lot of risk will only be spotted after the company started its own operation. Because up to this point, the company usually already determine which type of risk is the most likely to happen.
Answer Link

Otras preguntas

_______ is a way to minimize technical problems with your computer.
In a sample of human blood which cell is more predominant: white or red?
Which temperature scale has no negative temperatures? A) Celsius B) Fahrenheit C) Joule D) Kelvin
Sickle–cell anemia is caused when a mutation results in the replacement of glutamate with valine. Which type of mutation is observed here?
what is this equation 41 > 6m - 7
If f(x) = 2x + 3 and g(x) = x2 + 1,find f(g(3)). 23 47 82 90
The student throws one cannonball directly upward at 5.0 m/s and simultaneously throws the other cannonball directly downward at 5.0 m/s. (this requires great d
85% of what is 136??
which charater is not consider major in the Tragedy of julius Ceaser
Select the expression that is equivalent to the expression given. 24 + 56 Question 1 options: 8 (3 x 7) 8 (3 + 7) 2 (12 x 7) 4 (8 + 14)