Which of the following is considered a major process flow structure?
a. Lean Manufacturing
b. Project
c. Fabrication
d. Lead Time

Respuesta :

frontloader13 frontloader13
  • 22-11-2015
Since lead time is the time period between the starting and completion of producing a product, lead time is a major process flow structure.
Answer Link

Otras preguntas

The soccer team is planning to sell health bars for a fundraiser. The prices of purchasing health bars from two different companies are represented by the syste
How many seconds are in 24 hours?
if (a+bi)(2+3i)+-1 gives the product (-11+5i) and (1-i) what does a= and b=
Read the first stanza of "Some Keep the Sabbath Going to Church". Some keep the Sabbath going to Church –. I keep it, staying at Home –. With a Bobolink for a
Eliza went for a swim. When she came out of the water, she felt cold. At the moment, a strong wind blew, and she felt even colder. Explain why did she felt even
A sinusoid is any function whose values repeat in a periodic manner. True or False.
The astronaut then measures the abundance of silicon on the new planet, obtaining the following results: Isotope Abundance. (%)Mass. (amu). 28Si73.7127.98. 29Si
What is the affirmative tú command of salir? I answered sal What is the affirmative tú command of ir? I answered ve How would you command someone not to spe
In a molecule of methane, carbon (having four valence electrons) binds to four hydrogen atoms. How many lone pairs of electrons will be represented in the Lewis
Was soundly defeated by ronald reagan in the 1980 presidential election.